Acessibilidade / Reportar erro

Modelling and Simulation of the Santa Rita Mine Milling Circuit

Abstract

The Santa Rita Mine, located in the State of Bahia, was the first Mirabela Mineração operation in Brazil.

Started in 2009, the nickel sulphide processing plant has undergone constant modifications, aiming to adapt to the changes in the ore. Main modifications included autogenous grinding converted to semi-autogenous, as well as the installation of a desliming stage aiming to remove ultrafine minerals which reduced the nickel recovery in flotation.

A full survey and ore characterization campaign was carried out to assess alternatives for increasing grinding circuit capacity. Experimental data were balanced and used to calibrate mathematical models which were the basis for simulation exercises.

This paper describes the main aspects related to circuit modeling and simulation, as well as assessing alternatives for increasing the grinding circuit capacity.

Keywords:
grinding; simulation; nickel

1. Introduction

Santa Rita is the greatest nickel sulphide discovery in the world in the last 20 years. It was discovered in 2004 and Mirabela Mineração started its operation in 2009. The production was focused on high quality nickel concentrate, with nickel grade varying between 13% and 15%.

The current processing capacity is 7.2 million t per year, producing approximately 20 kt of nickel in concentrates. Figure 1 shows a simplified circuit flow sheet.

Figure 1
Simplified Flow Sheet of the Processing Plant.

Mined ore is hauled to two primary crushers at an average rate of 1300 t/h. The primary crushing stage product is conveyed to a 67 kt capacity stockpile.

Reclaimed ore is conveyed at 860 t/h to the grinding circuit, which includes one SAG mill, two pebble crushers and two ball mills. The grinding circuit is pumped to a desliming stage at a P80 of 125 μm.

The desliming circuit was not installed in the original processing circuit. However, reduced nickel mineral recovery at flotation stages was observed in the initial operation, which was later associated with fibrous minerals, mainly chrysotile and lizardite, as described by Edwards et al. (1980)EDWARDS, C.R., KIPKIE, W.B., AGAR, G.E. The effect of slime coatings of the serpentine minerals, chrysotile and lizardite, on pentlandite flotation. International Journal of Mineral Processing, Amsterdam, v. 7, n.1, p. 33-42, 1980.. It includes three cyclone stages designed to remove such fibrous minerals which are concentrated in fine fractions.

The desliming product is pumped to the concentration circuit, based on the direct flotation of sulphide nickel minerals, together with copper, cobalt and PGM minerals. The metallurgical recovery of the plant is highly variable, depending on the mineralogical characteristics of the processed ore, mainly related to the amount of sulfide and non-sulfide nickel minerals. Global nickel metallurgical recovery averages 58%. The final concentrate with nickel grade varying between 13% and 15% is thickened and filtered to 9% humidity.

The optimization study started in the grinding circuit aiming to increase its capacity, followed by exercises targeting to increase nickel metallurgical recovery in the desliming stage.

2. Materials and methods

Industrial Survey Campaigns

Industrial circuit surveying is the basis for the mathematical modeling and simulation of grinding circuits. Experimental data derived from surveys are initially balanced for providing consistent flowrates and size distribution associated with each single stream around the circuit. Mass balanced data are also useful for assessing circuit performance in terms of both grinding and classification.

Even though it is the basis for any simulation exercise, industrial surveying is generally difficult to be carried out, due to the high flow rates at sampling points and operation stability among other aspects.

The mass balancing exercises are carried out to result in a high fidelity representation of circuit operation. In this case, the grinding circuit sampling was conducted following the criteria proposed by Napier-Munn (1996)NAPIER-MUNN, T.J. et al. Mineral comminution circuits: their operation and optimization. Indooroopilly, SMIJKRMC, 1996. 413 p., so as to reduce the sampling errors described in Gy's theory (1992)GY, P.M. Sampling of heterogeneous and dynamic material systems: theories of heterogeneity, sampling and homogenizing. Amsterdan: Elselvier, 1992. 653p.. The survey was designed to last one hour. Pulp sampling increments were obtained every 10 minutes, while conveyor belt samples were obtained by removing the respective conveyor belt contents during a crash-stop, the latter conducted after pulp sampling.

A total of 18 different grinding circuit and desliming stage flows were sampled, besides operational and process data of all the equipment involved.

Ore Characterization

In this case ore characterization aimed to provide physical, chemical, textural and mineralogical information to allow identifying losses and inefficiencies in the Santa Rita industrial plant.

According to Naschenveng (2003)NASCHENVENG, A.C. Modelagem e simulação do circuito de moagem da Ultrafértil. São Paulo: Escola Politécnica, Universidade de São Paulo, 2003. 101 p. (Dissertação de Mestrado). in the comminution area, technological characterization is used to assess energy associated to fragmentation, which is used to calibrate mathematical models.

A 150 kg SAG mill feed sample was separated after homogenization to be sent to the Laboratory of Simulation and Control (LSC) of the University of São Paulo.

The sample was used for carrying out standard fragmentation tests such as Bond WI (BWI) and Drop Weight Test (DWT).

Complementary Tests

Complementary bench tests were carried out so as to better assess specific ore processing aspects.

The first test included determining the fines distribution around the grinding circuit in order to assess the relative amount of natural and generated fines. The former associated with the natural distribution of such minerals in the various ore types, while the latter is related to fines generated in crushing and grinding equipment. The focus on fines was due to chrysotile and lizardite deleterious effects on flotation performance.

Samples from the milling circuit were screened at 8 and 2 mm sieves. The resulting fractions, i.e. +8 mm -8 +2 mm and -2 mm, were then crushed, ground and floated to assess the respective nickel recovery.

The second bench test aimed to assess desliming alternatives. It consisted in two different processing routes based on SAG mill discharge. The first route included desliming, grinding and flotation, while the second followed the grinding, desliming and flotation sequence. Therefore, the testing program aimed to compare the existing process (second route) with an alternative route, according to which the natural fines would be separated from the secondary grinding stage (ball milling) thus allowing the flotation stage to recover nickel minerals contained in the fines.

The third test was based on the work carried out by Senior and Tomas (2005)SENIOR, G.D; THOMAS, S.A. Development and implementation of a new flowsheet for the flotation of a low grade nickel ore.International Journal of Mineral Processing, Amsterdam, v. 78, n.1, p 49-61, 2005. that showed the benefits associated with staged flotation. The test aimed increasing the nickel metallurgical recovery in flotation by decreasing the losses due to overgrinding. Accordingly, the first flotation stage carried out with relative coarse particles would recover the already liberated nickel minerals which could be over ground in the subsequent grinding stage, thus not recovered in the existing flotation circuit.

The experimental conditions of flotation batch tests are presented in Table 1.

Table 1
Experimental Conditions Flotation Tests.

NaOH is used as pH modulator. CuSO4 and Citric acid is added as activators and Sodium Etil Xanthate (SEX) and Ditil Phosphate of Potassium (DTP) is used as collectors

Modelling and Simulation

The surveyed data were balanced in a JKSimMet simulator. The mass balanced data were the basis for the fitting crushing, milling and classification mathematical models, the latter including desliming stages. The characterization tests results were used in all comminution models.

After calibrating the models, a series of simulations were conducted aiming to increase the circuit throughput, by adjusting process variables along with modifications in the circuit flow sheet, the latter following the complementary test results.

3. Results and discussion

Ore Characterization

The Bond WI test carried out on grinding circuit fresh feed resulted in a 21.1 kWh/t for a 0.150 mm closing test screen. The result was regarded as an extremely high, according to Delboni Jr. (2003).

The A*b parameter derived from DWT was 46, classified as moderately high, according to Delboni Jr. (2003)DELBONI JR, H. Modelagem e simulação de circuitos de cominuição e classificação. São Paulo, Escola Politécnica, 2003. (Apostila do Curso PMI 5004)..

Complementary Tests

Results obtained from flotation tests carried out on discrete size fractions are listed in Table 2.

Table 2
Natural Fines Results.

Sampling and Modelling

The sampling program was carried out as planned under steady-state operating conditions. Mass balance exercises resulted in relatively low deviations which thus indicate the overall good experimental data quality. Table 3 shows both experimental and respective mass balance results obtained from the selected nine sampling points.

Table 3
Summary of the experimental and balanced data.

Mass balanced results indicated a relatively low circulating load (163%) in the ball mills. It also indicated a 21.0 operational WI. According to Rowland (1978)ROWLAND, C.A. Determination and use of operating work indices in controlled grinding circuits - a proposed concept. In: MILL OPERATOR'S CONFERENCE, 1978. North West Queensland Branch. Papers presentedat the Mill Operator's Conference.Parkville: Australasian Institute of Mining and Metallurgy, 1978, p.71-78. the ratio between laboratory WI and operational WI results in grinding efficiency. Thus, in this case the ball mill grinding circuit resulted in 99.9% efficiency, which is here considered abnormally high.

Another selected performance index was the by-pass or fine removal in the desliming stage. The calculations indicated a 69% by-pass of the 0.010 mm fraction which was here regarded as a very low efficiency.

Model fitting indicated an overall low deviation which thus resulted in a relatively high adherence between balanced and fitted data.

Figure 2 shows SAG and ball mills breakage rates. Note that the curve exhibits the classic behavior of a SAG mill curve, showing the effect of the ore as the grinding media in coarse particles and the effect of balls, which begins to appear in the 50 mm particle size, having its greatest point at 7 mm. For all mills, the breakage rate indicates a profile with a well-defined inflection point. The kinetics is therefore increased for particles up to 6 mm, and decreased for sizes larger than this.

Figure 2
Breakage Rates.

Simulations

The first simulation set aimed to improve the desliming performance. Simulation 1 consisted in operating the 10" cyclone cluster in open circuit, diverting its overflow to the tailings, i.e. no longer returning to the 20" cluster. Simulation 2 included Simulation 1 changes, together with diverting the 4" cyclone cluster underflow to the 10" cyclone cluster feed.

The fine by-pass was reduced from 69.1% (Base Case - current operation) to 57.3% and 44.4% respectively in Simulations 1 and 2.

The second simulation set explored alternatives to increase grinding circuit throughput. The modifications included (a) increasing the SAG mill ball charge from current 8% to 12%, as well as (b) reducing the cyclone pulp feed density for the achievement of the stipulated cut size. Such a combination was due to the fact that when increasing the SAG mill ball charge, it grinds coarser, and by reducing the cyclone feed percent solids, it reduces the cut size, thus returning to the original cut size. In such circumstances the circulating load would be increased.

Simulation 4 included changes adopted in Simulation 3, along with (a) reducing the SAG mill ball diameter from 5" to 4", (b) reducing the ball mill ball diameter from 2.5" to 2" and (c) increasing the ball charge in the ball mills from 27.5% to 30%. All these modifications aimed to increase the energy consumption in both SAG and two ball mills, which would thus be converted into a higher circuit throughput.

Simulation 4 resulted in a 1070 t/h overall circuit throughput which corresponds to a 29% increase as compared with the Base Case, while in Simulation 3 the throughput was 975 t/h. Ball mill circulating loads were increased to 200% in Simulation 4; therefore, higher than the Base Case figure (163%). The same Simulation 4 indicated a grinding product P80 of 0.145 mm. A limiting operation condition was the classification pump volumetric flow rate, limited to 3600 m3/h.

Based on laboratory flotation test results, two further simulations were carried out by changing the circuit flow sheet. Both targeted increasing Ni metallurgical recovery.

Simulation 5 was based on test results, which indicated the deleterious effects associated with natural slimes, as opposed to generated fines which showed no reduction in nickel recovery. Hence, the simulation consisted in including a pre-classification stage after the SAG mill discharge. The pre-classification overflow was thus diverted to desliming stages, while the underflow was directed to flotation.

The results from Simulation 5 showed a 1095 t/h overall circuit throughput, due to the double classification stage prior to ball milling stage.

Simulation 5 also indicated a reduction in slime recovery, from 2.2% as compared with 8% of the Base Case.

Simulation 6 considered the two-stage ball milling concept, including one flotation stage between the two milling stages, as well as one after the second ball milling stage. The strategy here was to reduce Ni mineral overgrinding and therefore the Ni losses in flotation. In other words, the two existing parallel ball mills would be converted to an operation in series. Simulation 6 was based on the changes included in Simulation 5.

Simulation 6 results showed 1050 t/h circuit throughput, yielding 0.213 mm and 0.138 mm P80 values respectively at first and second ball milling stage discharges.

Simulation exercise results were used to calculate the respective nickel production based on laboratory flotation tests. The results are listed in Table 4.

Table 4
Nickel Production Simulations.

The highest nickel recovery was derived from the two-stage milling option with two flotation stages (Simulation 6). However, the highest nickel production was obtained for the anticipated desliming stage. The obtained figure (2.92%) was 43% higher than the Base Case (2.04%).

4. Conclusions

The survey campaign planning and sampling techniques were considered adequate as mass balance indicated low deviations between experimental and balanced results. The latter were successfully used for modeling the entire comminution circuit, together with the desliming stage, thus creating a Base Case.

The Base Case assessment of operation performance indicated a low circulating load in the ball milling stage, as well as very low efficiency in the desliming stage.

Laboratory batch tests indicated a great potential for improving the nickel global recovery by relatively simple changes in the current process flow sheet. Accordingly, a desliming stage after SAG milling would prevent significant losses in nickel contents, as compared with current desliming after the ball milling stage. Staged ball milling and flotation would also enhance significantly the overall nickel metallurgical recovery.

In the desliming circuit, a better performance would be achieved by operating the 10" cyclone cluster in open circuit, diverting its overflow to the tailings, ie. no longer returning it to the 20" cluster.

Increasing ball mill charge, along with adjusting the percent solids in classification feed, resulted in significant increase in the circuit overall throughput.

Modelling and simulation were considered decisive tools for both assessing and improving circuit performance of the Santa Rita concentrator. The simulations indicated potential benefits to enhance nickel recovery and production, thus providing support for decision-making.

5. Acknowledgements

The authors wish to thank Mirabela Mineração especially Mr. Evandro Faria for supporting this study.

6. References

  • DELBONI JR, H. Modelagem e simulação de circuitos de cominuição e classificação São Paulo, Escola Politécnica, 2003. (Apostila do Curso PMI 5004).
  • EDWARDS, C.R., KIPKIE, W.B., AGAR, G.E. The effect of slime coatings of the serpentine minerals, chrysotile and lizardite, on pentlandite flotation. International Journal of Mineral Processing, Amsterdam, v. 7, n.1, p. 33-42, 1980.
  • GY, P.M. Sampling of heterogeneous and dynamic material systems: theories of heterogeneity, sampling and homogenizing. Amsterdan: Elselvier, 1992. 653p.
  • NAPIER-MUNN, T.J. et al. Mineral comminution circuits: their operation and optimization. Indooroopilly, SMIJKRMC, 1996. 413 p.
  • NASCHENVENG, A.C. Modelagem e simulação do circuito de moagem da Ultrafértil São Paulo: Escola Politécnica, Universidade de São Paulo, 2003. 101 p. (Dissertação de Mestrado).
  • ROWLAND, C.A. Determination and use of operating work indices in controlled grinding circuits - a proposed concept. In: MILL OPERATOR'S CONFERENCE, 1978. North West Queensland Branch. Papers presentedat the Mill Operator's ConferenceParkville: Australasian Institute of Mining and Metallurgy, 1978, p.71-78.
  • SENIOR, G.D; THOMAS, S.A. Development and implementation of a new flowsheet for the flotation of a low grade nickel ore.International Journal of Mineral Processing, Amsterdam, v. 78, n.1, p 49-61, 2005.

Publication Dates

  • Publication in this collection
    Apr-Jun 2016

History

  • Received
    27 Feb 2014
  • Accepted
    09 Mar 2016
Escola de Minas Rua Carlos Walter Marinho Campos, 57 - Vila Itacolomy, 35400-000 Ouro Preto MG - Brazil, Tel: (55 31) 3551-4730/3559-7408 - Ouro Preto - MG - Brazil