Acessibilidade / Reportar erro

Mono-stage formulations for the soft drink production process with two synchronized stages

In this work we present single-stage formulations for the integrated soft drink lot-sizing and scheduling problem with two-stage synchronization. It is a multi-product, multi-machine problem, with sequence-dependent setup times and costs. Without loss of generality, these single-stage reformulations address the problem correctly and, in general, reduce the size of the synchronized two-stage model of Ferreira, Morabito e Rangel (2009), regarding the number of variables and constraints. The preliminary computational experiments on real-world instances from a soft-drink company show the competitiveness of the single-stage models against other formulations and solution approaches reported in the literature.

Integrated lot-sizing and sequencing; Soft drink production scheduling; Mixed integer programming; Mathematical programming


Associação Brasileira de Engenharia de Produção Av. Prof. Almeida Prado, Travessa 2, 128 - 2º andar - Room 231, 05508-900 São Paulo - SP - São Paulo - SP - Brazil
E-mail: production@editoracubo.com.br