Acessibilidade / Reportar erro

Quality management in the process of monitoring public works: A methodological proposal

Gerenciamento da qualidade no processo de monitoramento de obras públicas: uma proposta metodológica

Abstract:

In this research article, we present a methodological proposal for improving the process of monitoring public works using quality management. To do this, we have reviewed the monitoring process carried out by the National Education Development Fund (FNDE) during the Proinfância program. We adopted a case study based ondesign science researchas a methodology. This article presents the phases of the literature review, a map of the current work monitoring process, a survey and analysis of the data collected with the current process and a methodological proposal for the construction monitoring process. As a result of the work, a new flow for the work monitoring process is proposed, consisting of internal procedures, work routines and collection tools. The proposed methodology was applied to 15 works, and the results were analyzed.

Keywords:
Quality management; Construction work; Monitoring; Proinfância; Process mapping; Checklist

Universidade Federal de São Carlos Departamento de Engenharia de Produção , Caixa Postal 676 , 13.565-905 São Carlos SP Brazil, Tel.: +55 16 3351 8471 - São Carlos - SP - Brazil
E-mail: gp@dep.ufscar.br