Effects of maintenance management procedures in sugarcane mechanic harvesting system equipment

Efeitos da programação de procedimentos de manutenção em equipamentos do sistema de colheita mecanizada de cana-de-açúcar1 1 Projeto realizado com fomento do CNPq

ABSTRACT

The aim of this study was to evaluate the effects of modifying the maintenance programming of equipment used in sugarcane mechanical harvesting, by transferring actions that can be planned to periods when machines are inactive due to meal breaks and other working shift transitions stoppages. A simulation model was developed to represent the maintenance procedures of combines, haulouts, and other vehicles used by a harvest team. Scenarios were tested using alternatives for interventions such as refueling, lubrication and harvester blade replacement, enabling strategies to be focused towards better utilization of cutting, loading, and transport (CLT) system equipment. As a result, it was possible to remove one combine and two haulouts, while maintaining current daily production. The maintenance time for harvesters, which refers to corrective maintenance and the transfer of remaining interventions for periods of inactivity, was reduced from 10.0% to 3.5% over the useful period. This study indicates that maintenance management in the sugarcane sector enables the expanded use of equipment, leading to the greater productivity of the CLT system.

agricultural machinery; breakdowns; simulation

RESUMO

O objetivo deste trabalho foi avaliar os efeitos da modificação da programação da manutenção dos equipamentos utilizados na colheita mecanizada de cana-de-açúcar, ao se transferir as intervenções que podem ser programadas para períodos em que as máquinas estão inativas, em razão de refeições e trocas de turno dos operadores. Um modelo de simulação foi desenvolvido para representar os procedimentos de manutenção de colhedoras, tratores-transbordo e veículos de uma frente de colheita. Foram testados cenários com alternativas de intervenções como o abastecimento, a lubrificação e a troca de facas das colhedoras, tornando possível a análise de estratégias para o melhor aproveitamento de todo o sistema de corte, carregamento e transporte (CCT). Como resultado, foi possível reduzir uma colhedora e dois tratores-transbordo, mantendo a quantidade de cana processada. A taxa de manutenção das colhedoras passou de 10,0% para 3,5% em seu período útil, referente às manutenções corretivas, transferindo as demais intervenções para os períodos de inatividade. O estudo indicou que a gestão da manutenção no setor sucroenergético viabiliza a ampliação do uso dos equipamentos e, consequentemente, a obtenção de maior produtividade do sistema de CCT.

máquinas agrícolas; quebras; simulação

INTRODUCTION

The sugarcane sector is a key economic activity in Brazil due to its productivity and due to the technology applied in agricultural areas. According to the National Supply Company (CONAB, 2014CONAB - COMPANHIA NACIONAL DE ABASTECIMENTO. Acompanhamento da safra brasileira de cana-de-açúcar - Quarto Levantamento. Brasília, 2014, v.1.), in the 2013/2014 harvest, 658 million tons of sugarcane were processed, which produced 28 million cubic meters of ethanol and 38 million tons of sugar. Among the factors that drive forward this sector in Brazil, is the incentive to ethanol use, according to TRIANA (2011) and mentioned by MORAES et al. (2014)MORAES, R. A.; ROCHA, J. V.; LAMPARELLI, R. A. C. Determination of total accumulated rainfall, global radiation, evapotranspiration and degree-days originated from the ECMWF model to sugar cane crop. Engenharia Agrícola , Jaboticabal, v. 34, n. 2, p.322-331, mar./abr. 2014., as it is both an alternative to fossil fuels and makes use of sugarcane sub products for energy purposes.

Sugarcane production chains were forced to restructure their processes in order to reconcile environmental, economic, and social issues. In manual harvesting, field burning enables cutting but reduces air quality and causes severe damage to public health (AGUIAR et al., 2009AGUIAR, D. A.; RUDORFF, B. F. T.; ADAMI, M.; SHIMABUKURO, Y. E. Imagens de sensoriamento remoto no monitoramento da colheita da cana-de-açúcar.Engenharia Agrícola . Jaboticabal, v.29, n.3, p.440-451, jul./set. 2009.). After an act of São Paulo state legislation stipulating a chronogram to the end the burning (Law 11.241/02), producers intensified mechanization, using combines that process sugarcane without the need for previous burn. As reported by CAPAZ et al. (2013)CAPAZ, R. S.; CARVALHO, V. S. B.; NOGUEIRA, L. A. H. Impact of mechanization and previous burning reduction on GHG emissions of sugarcane harvesting operations in Brazil. Applied Energy , Amsterdam, v.102, p.220-228, fev. 2013., mechanization in a haulout consists of the threshing, cutting and disposal of sugarcane.

Considering the complexity and high price of equipment, the interaction of processes that compose mechanical harvesting must be well planned to avoid wasting time and money. In accordance with HIGGINS et al. (2004)HIGGINS, A.; ANTONY, G.; SANDELL, G.; DAVIES, I.; PRESTWIDGE, D.; ANDREW, B. A framework for integrating a complex harvesting and transport system for sugar production. Agricultural Systems , Barking, v.82, p.99–115. 2004., harvest and transport operations can potentially reduce costs, as they are independent sectors with representative costs. Among the operations subject to planning, maintenance is highlighted as being directly related to the appropriate use and productivity of machines. According to PINTO (1994) cited by FILIPE (2006)FILIPE, F. M. C. Gestão e organização da manutenção, de equipamento de conservação e manutenção de infra-estruturas ferroviárias . Porto: Universidade do Porto, 2006., maintenance can be analyzed under three headings: economic, legal, and social. The first represents the best usage of conducted investments and increased useful life of equipment; the second represents adaptation to safety and quality standards and the third characterizes preservation and improvement of the corporate image.

As stated in requirements related to maintenance, such as NBR 5462 (ABNT, 1994ABNT - ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. NBR 5462 : confiabilidade e mantenabilidade. 1994.) and the British Standard BS EN 13306 (2010) cited by NARAYAN (2012)NARAYAN, V. Business performance and maintenance. Journal of Quality in Maintenance Engineering , Bradford, v. 18, n.2, p. 183-195. 2012., maintenance is the combination of technical and administrative techniques, including supervision, aimed at keeping or replacing an item to a state in which it can perform a required role. Thus, it allows process continuity and greater employment of systems.

KARDEC & NASCIF (2012)KARDEC, A.; NASCIF, J. Manutenção : função estratégica. 4. ed. Rio de Janeiro: Qualitymark, 2012. highlight the importance of maintenance planning and organization, through creation of a system that allows the establishment of guidelines governing, for example, which services will be carried out, when they will be conducted and the materials that are required. Therefore, it is observed that focus on planning will minimize non-programed stoppages and guarantee efficiency of maintenance processes.

In order to have an efficient planning of operations related to maintenance, management tools can assist decision-making regarding activities subject to programming. Of the options, simulation of discrete events can be interesting as it consists of the development of a model that represents systems of interest in a digital environment. Therefore, simulation can enable us to explore scenarios and compare hypotheses that could be difficult to experiment. In other words, according to FREITAS FILHO (2008)FREITAS FILHO, P. J. Introdução à modelagem e simulação de sistemas : com aplicações em Arena. 2. ed. Florianópolis: Visual Books, 2008., simulation permits the analyst to carry out studies to answer questions without disturbing the systems themselves.

The aim of this study was to evaluate maintenance planning procedures for equipment involved in the cutting, loading, and transport of sugarcane crop. Scenarios with planning alternatives are compared through simulation of discrete events, using indicators like productivity and idleness of equipment.

MATERIAL AND METHODS

This study was based on the methodologies of FREITAS FILHO (2008)FREITAS FILHO, P. J. Introdução à modelagem e simulação de sistemas : com aplicações em Arena. 2. ed. Florianópolis: Visual Books, 2008., BANKS (1998)BANKS, J. Handbook of simulation . New Jersey: John Wiley & Sons, 1998., andKELTON et al. (2007)KELTON, W. D.; SADOWSKI, R. P.; STURROCK, D. T. Simulation with Arena . 4th ed. Boston: McGraw-Hill Higher Education, 2007., synthetized into six steps: aim definition, preliminary modeling, data collection, definitive modeling, validation and experimentation (Figure 1).

FIGURE 1
Steps in a simulation study.

After defining the study objective, a preliminary model of cutting, loading, and transport operations (CLT) was developed with a mechanic-harvesting front of sugarcane crop, using Arena software v. 14. The model was focused on the harvest, trans-shipment, and transport of sugarcane to the plant. There, the model considered the weighting (gross), sampling (probe), unloading and weighting of vehicle (tare). Maintenance, operation and handling times of equipment (combines, haulouts and vehicles), were collected at a Bauru/SP region plant. From this data, probability distributions were set to represent operations, thus concluding the definitive modeling. In this process, adherence was verified through Chi2and Kolmogorov-Smirnov tests, as identified by FREITAS FILHO (2008)FREITAS FILHO, P. J. Introdução à modelagem e simulação de sistemas : com aplicações em Arena. 2. ed. Florianópolis: Visual Books, 2008.. The probability distributions obtained from statistical treatment were used in simulations of all studied scenarios.

The model was validated through the comparison of the results obtained using the model with the real results of CLT system, confirmed by the plant agricultural administration. According to BALCI (1994), PIDD (1995), and SARGENT (1994) cited byFREITAS FILHO (2008)FREITAS FILHO, P. J. Introdução à modelagem e simulação de sistemas : com aplicações em Arena. 2. ed. Florianópolis: Visual Books, 2008., the analysis and evaluation of models by specialists is the most simple and efficient validation form.

With assumptions from the plant, the reference scenario was designed for simulation, which in experimentation was explored in new intervention planning, in periods of machine inactivity (meal breaks/working shifts transitions stoppages). For each scenario, a comparison table and a histogram of sugarcane production were generated, to measure risk of not meeting the goal. The remaining assumptions are:

  • Simulated time of 200 days, with targeted average daily production of 3,000 Mg day-1;

  • Nominal milling of 125 Mg h-1, with 5% of increment (milling peak);

  • Equipment in reference scenario: 5 combines, 10 haulouts and 9 vehicles;

  • Transport in road trains, with net load of 55 Mg, with accommodation of 8 transshipments;

  • Haulout configuration: traction of two transshipment implements per tractor;

  • Average distance between the harvest team and plant of 25 km;

  • Agriculture operations represented by probability distributions, according toTable 1;

TABLE 1
: Average values for agriculture operations.

  • Maintenance/interruptions: for each intervention, two probability interventions were found: time between interventions and time (duration) of intervention. Tables 2, 3 and 4 indicate average times for combines, haulouts and vehicles;

    TABLE 2
    Interventions for combines.

    TABLE 3
    Interventions for haulouts.

    TABLE 4
    Interventions for vehicles.

  • Three shifts of 8 h day-1, starting at 7:00 am, 03:00 pm and 11:00 pm, with 1 h for meal;

  • Meal stoppage limit of 2 combines and 4 haulouts simultaneously;

  • Shift transitions can start at 0.5 h before the end of shift; together with 3 daily hours of meal breaks, the available time for production is around 21.0 and 19.5 h per day.

RESULTS AND DISCUSSION

Five scenarios were simulated: a reference scenario for validation and reference and four alternative scenarios with programing variations of maintenance subject to planning.

Reference scenario

The results of the reference scenario (Table 5 and Figure 2) were obtained with plant data.

TABLE 5
Results for the reference scenario.

FIGURE 2
Average production and frequencies - reference scenario.

Daily delivery exceeded 3,000 Mg day-1 in 98% of simulated days, indicating comfortable achievement of the targeted goal. In 2% of days, the delivered sugarcane was between 2,950 and 3,000 Mg day-1. Maintenance percentage of combines was 10.1% of available time for production.

Operational capacity of combines of 617.7 Mg day-1 was comparable with the existing system in a partner plant where data was collected, without equipment overload. Regarding cycle time of transport, it is noted that the truck stayed for 1.21hrs in the plant, confirming that the unloading process operated within the limit, and constituted the CLT system bottleneck.

Scenario 1

In scenario 1, the quantity of combines and haulouts was reduced to 4 and 8, respectively, once the delivery of 3,000 Mg day-1 had already been effortlessly reached in reference scenario. In order to make better use of available production time in this scenario, refueling and lubrication activities of combines were altered and transferred to meal times and shift transitions periods. These alterations led to results presented on Table 6 and Figure 3.

TABLE 6
Results for scenario 1.

FIGURE 3
Average production and frequencies for scenario 1.

Scenario 1 showed a reduction in average daily production of 5.5%, to 2,917.5 Mg day-1, compared to the reference scenario. Production above 3,000 Mg day-1 occurred in 38% of days. In relation to the previous scenario, the time of vehicles in plant was reduced from 1.21 h to 0.82 h, as the CLT system bottleneck was transferred to field, motivated by a reduction of combine and of two haulouts. On the other hand, permanence time of truck in field increased from 0.73 h to 1.32 h, an increment of 80.1% and cycle time of haulouts reduced from 0.61 to 0.52; which means, a reduction of 14.7%. The operational capacity of combines of 729.4 Mg day-1 was considered high, but feasible when discussed with the managerial team of the partner plant, once the existing system of reference scenario was recognized as under-used. A drop in maintenance time percentage of combines was also observed, from 10.1% to 6.6% of available time for production, once part of interventions was relocated to periods when the equipment were out of operation.

Scenario 2

In scenario 2, refueling and lubrication operations of haulouts were also transferred to periods of meals and shift transitions. The remaining operational conditions are the same from scenario 1. The obtained results are described onTable 7 and Figure 4.

TABLE 7
Results for scenario 2.

FIGURE 4
Average production and frequencies for scenario 2.

The strategy used in scenario 2 enabled an increase on average daily delivery of 2%, improving it to 2,976.9 Mg day-1; however, the greatest benefit was the indicative of daily registry that pointed that in 71% of days the delivery was above 3,000 Mg day-1, which is promising, considering the value of 38% registered in previous scenario. There was also a reflex on truck cycles where average permanence time of truck in harvest team was reduced in 0.12 h. In total, truck cycle time was slightly reduced in 0.08 h in relation to scenario 1; yet haulout cycle was unaltered.

Scenario 3

Additionally to characteristics and parameters of scenario 2, scenario 3 considers transfers of combine blade replacement procedures to meals and shift transitions periods. The results are presented on Table 8 and Figure 5.

TABLE 8
Results for scenario 3.

FIGURE 5
Average production and frequencies for scenario 3.

Sugarcane daily delivery of this scenario was above 3,000 Mg in 83% of days. The blade replacement alteration reduced combine maintenance percentage to 3.5% of useful time, which now corresponds only to non-planned corrective maintenance. This alteration enabled better use of the combine, once average productivity reached 750 Mg day-1, as well as permanence time reduction of truck in harvest team of 0.06 h per cycle. Total truck cycle, however, did not present significant variation in relation to previous scenario as the gain obtained in harvest caused an increased time in plant.

Scenario 4

Scenario 4 adds to conditions of previous scenario the assumption that truck drivers should have their meals while waiting trucks being loaded by haulouts in field and during plant internal processes. This could be possible by hiring another employee to move trucks while drivers have their meals in the field or plant. The results are found on Table 9and Figure 6.

TABLE 9
Results for scenario 4.

FIGURE 6
Average production and frequencies for scenario 4.

This scenario raised the average daily delivered sugarcane, where 98% of days reach the reference of 3,000 Mg day-1. However, it was also verified that the total cycle of vehicles increased from 3.49 h to 3.66 h. This occurred due to greater vehicle release during meal time, which started accumulating in circuit ends, in field as well as in plant, generating more competition for loading and unloading, respectively.

Scenario evolution analysis

The results from each scenario were summarized on Table 10.

TABLE 10
Summary of results for 5 scenarios.

It is observed that the average delivered sugarcane was kept stable in the scenarios, varying from 2,917.5 and 3,088.5 Mg day-1 (5.9% amplitude), even with the reduction of one combine and two haulouts, equipment of highest operational cost in the sector. According to SANTOS et al. (2014)SANTOS, N. B.; SILVA, R. P.; GADANHA JÚNIOR, C. D. Economic analysis for sizing of sugarcane (Saccharum spp.) mechanized harvesting. Engenharia Agrícola , Jaboticabal, v.34, n. 5, p.945-954, set./out. 2014., in a reference scenario, a combine represented 75.5% of harvest and transshipment systems costs. Regarding combine costs, the maintenance and repair parcel corresponds to 40.4% and fuel cost to 34.3%.

Besides the drop of 5.5% of delivered sugarcane from reference scenario to scenario 1, the adopted actions related to maintenance and meal planning helped sustaining the delivered quantity of the reference scenario. Thereby, the proposed strategies advantageously maintained production, with low risk of destocking.

Differences in time percentages of usage, idleness and maintenance of presented combines were observed. As the scenarios progressed, maintenance rate varied from 10.0% to 3.5% of useful time, due to gradual transfer of maintenance procedures that can be planned for inactivity periods (meals and shift transitions stoppages). However, only the reduction of maintenance time in the useful journey does not guarantee increased operational capacity, once global performance of harvest system is limited to milling and transport system.

Regarding displacement cycles of haulouts and trucks, evolution of scenarios resulted in greater usage of combines and haulouts. Comparing the reference scenario with the remaining ones, there was a reduction in haulouts average cycle in approximately 0.09 h, which originally waited for combine maintenance during period available for production. The truck cycle is also diminished throughout 1, 2, and 3. In other words, as combines and haulouts present less time directed to maintenance procedures during the available time for production, greater is the equipment use efficiency.

In scenario 4, the meal alterations of trucks permitted increased average quantity of delivered sugarcane, with low risk of destocking, however, in order to be feasible, this scenario must accept hiring cost of additional labor.

Balancing the requirements of target compliance and lower risk of destocking, scenario 3 presented the best maintenance planning for the studied case. It is also known that in scenarios 1, 2, and 3, the transfer of maintenance procedures to inactivity periods presupposes availability of labor and materials, such as convoys of refueling and lubrication, to conduct procedures over the available time.

CONCLUSIONS

The programming of subjected maintenances of sugarcane harvest and transport equipment benefits the whole CLT system. In the studied case, programming of refueling, lubrications and blade replacement enabled reduction of one combine and two haulouts, achieving the targeted sugarcane delivery, which proves interaction among CLT equipment, able to be represented by the simulation model. Similar studies of maintenance planning can be conducted in other sectors or in other sugarcane systems in order to evaluate strategies of greater use of production resources.

ACKNOWLEDGEMENTS

The authors thank CNPq for the research financial support.

REFERENCES

  • ABNT - ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. NBR 5462 : confiabilidade e mantenabilidade. 1994.
  • AGUIAR, D. A.; RUDORFF, B. F. T.; ADAMI, M.; SHIMABUKURO, Y. E. Imagens de sensoriamento remoto no monitoramento da colheita da cana-de-açúcar.Engenharia Agrícola . Jaboticabal, v.29, n.3, p.440-451, jul./set. 2009.
  • BANKS, J. Handbook of simulation . New Jersey: John Wiley & Sons, 1998.
  • CAPAZ, R. S.; CARVALHO, V. S. B.; NOGUEIRA, L. A. H. Impact of mechanization and previous burning reduction on GHG emissions of sugarcane harvesting operations in Brazil. Applied Energy , Amsterdam, v.102, p.220-228, fev. 2013.
  • CONAB - COMPANHIA NACIONAL DE ABASTECIMENTO. Acompanhamento da safra brasileira de cana-de-açúcar - Quarto Levantamento. Brasília, 2014, v.1.
  • FILIPE, F. M. C. Gestão e organização da manutenção, de equipamento de conservação e manutenção de infra-estruturas ferroviárias . Porto: Universidade do Porto, 2006.
  • FREITAS FILHO, P. J. Introdução à modelagem e simulação de sistemas : com aplicações em Arena. 2. ed. Florianópolis: Visual Books, 2008.
  • HIGGINS, A.; ANTONY, G.; SANDELL, G.; DAVIES, I.; PRESTWIDGE, D.; ANDREW, B. A framework for integrating a complex harvesting and transport system for sugar production. Agricultural Systems , Barking, v.82, p.99–115. 2004.
  • KARDEC, A.; NASCIF, J. Manutenção : função estratégica. 4. ed. Rio de Janeiro: Qualitymark, 2012.
  • KELTON, W. D.; SADOWSKI, R. P.; STURROCK, D. T. Simulation with Arena . 4th ed. Boston: McGraw-Hill Higher Education, 2007.
  • MORAES, R. A.; ROCHA, J. V.; LAMPARELLI, R. A. C. Determination of total accumulated rainfall, global radiation, evapotranspiration and degree-days originated from the ECMWF model to sugar cane crop. Engenharia Agrícola , Jaboticabal, v. 34, n. 2, p.322-331, mar./abr. 2014.
  • NARAYAN, V. Business performance and maintenance. Journal of Quality in Maintenance Engineering , Bradford, v. 18, n.2, p. 183-195. 2012.
  • SANTOS, N. B.; SILVA, R. P.; GADANHA JÚNIOR, C. D. Economic analysis for sizing of sugarcane (Saccharum spp.) mechanized harvesting. Engenharia Agrícola , Jaboticabal, v.34, n. 5, p.945-954, set./out. 2014.
  • 1
    Projeto realizado com fomento do CNPq

Publication Dates

  • Publication in this collection
    Nov-Dec 2015